Pars Consult | Municipal Water Supply, Treatment & Distribution
15590
page-template,page-template-full_width,page-template-full_width-php,page,page-id-15590,ajax_fade,page_not_loaded,,qode-theme-ver-17.2,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.6,vc_responsive
 

Municipal Water Supply, Treatment & Distribution

Our Projects

Projects

Aligudarz Water Supply Treatment and Distribution

 

This Project included an intake structure on Kamandan River, 42 km of pipeline transmission ,a 30 000 m3/d treatment plant, pump station, storage tanks and 190km of distribution network in 6 pressure zones. The project has been completed And is being used.

Amol Water Supply and Distribution

 

For population of 300,000 the project has been completed and parts of it constructed and commissioned.

Sadra Water Supply and Distribution

 

For a population of 300,000 for this new city, the project has been partly constructed

Golbahar Water Supply & Distribution

 

For a population of 400,000 for this new city near Mashhad. The project has been constructed.

Khoram Abad Water Supply, Treatment and Distribution

 

For a population of 650 000. The project includes transferring water from three Sources to a treatment plant with a capacity of 150 000 m3/d construction of a Pump station, storage reservoirs and distribution network.Most of the network, Pump station and first stage of the treatment plant is under construction.

Khash Water Supply Treatment and Distribution

 

For a population of 85,000 with a dual distribution system. The project has been completed and commissioned.

Khoram Abad Unaccounted Water

 

The project covered about 1/3 of the city encompassing 13,500 house connections. A complete review of the distribution system was carried out and recommendation were made for rehabilitation of the system.

Ardak Water Treatment

 

The water is supplied from Ardak Dam and treated at a rate of 61,000 m3/d using pulsators and filters. The complete design and preparation of tender documents have been finalized.

Qaem Shahr Water Supply & Distribution

 

For a population of 320,000. Design has been completed.

Gorgan Water Supply and Distribution

 

For a population of 320,000. This project is under construction.

Neshabour Unaccounted Water

 

The project took in to account parts of the city Encompassing 24,000 house connections, a complete review of the distribution system was carried out and recommendation for improvements were made.

Dorud Water Supply and Distribution

 

Design is completed for a population of 180,000 and under construction.

Esfahan Water Supply and Distribution

 

This is one of the major water supply projects carried out in Iran and included an intake diversion Dam with settling basins on Zayande Rud river. 60km of with settling concrete pipeline 2400 mm in diameter and 15km of 305m diameter pressure tunnel transmission, treatment plant with a capacity Of 10 cm/s and 230,000m3 of storage tanks serving a population of 2.8 million. A pre-stressed concrete pipe manufacturing plant was designed And tendered within the scope of this project, which Ultimately supplied the required pips. The project is completely finished and servers the Greater Esfahan area residents.

Baghmisheh Water Distribution

 

For a new residential development with 4700 dwellings within the city of Tabriz. This project is completed.

Bushehr Water Distribution

 

For a population of 100,000 in new extension to the city named Aali shahr. The project is constructed and commissioned.

Hamedan Water Supply Master Plan

 

Along range study to identify possible supply sources for the city of Hamedan covering an area of 47,000km2. Proposal was made to transfer water to the city from over 200km away.

Kermanshah Water Distribution

 

For a population of 720,000 people. This projects has been completely constructed and serves the city of Kermanshah.

Zahedan Water Supply

 

Covering a population of 180,000 included R.O. WATER TREATMENT PLANT. The project was constructed and commissioned.

Khorasan Water Supply and Distribution

 

For 35 population centers. This project was the start of our company and included all the municipalities of the province at the time. Through this study distribution networks were designed and all these cities were finally supervision of construction was carried out by Parsconsult.